NITEC conducted an integrated reservoir study in a complex fluvial sand gas storage field to provide operations strategies for controlling gas migration between the main storage structure and a small low productivity structure and improving deliverability and working gas capacity. The project resulted in 10 new wells which increased deliverability by 75 MMCF/d and increased working gas by 10 BCF and provided a strategy to eliminate the gas migration.